Next up was to mount and fill the diff. Not the most difficult task but still needs to be done. The black gunge around the CV bearing housing is silicon to seal it as otherwise oil might weep out between the bearing and the diff plates.
Archive for June, 2009
Differential
Sunday, June 21st, 20092009 Initial Aero Kit
Sunday, June 21st, 2009Exhaust
Sunday, June 21st, 2009The next major item to go onto the car was the exhaust. As the exhaust runs reasonably close to the cockpit, being a mid engined car, I have decided to wrap the exhaust to try a keep some heat away from the cockpit.
After measuring the length required, the wrap needs to soak in water.
Engine In
Monday, June 15th, 2009So, the main focus for the evening was to get the engine in! Unfortunately I was on my own, which was not really a problem, apart from lifting the engine in. Luckily we have an engine crane, so I wrapped a tie down around the engine and craned it in. In similar fashion to the side panels, I covered the chassis in liberal amounts of tape to protect the paintwork. After a bit of a struggle it was in and all bolted down. I would have then gone on to assemble the exhaust and mount it all up, but I had not ordered the exhaust wrap in time, hopefully it should be at home next week.








